Default anyone know roughly...

...how much to poor a batch of concrete 26 square metres from a ready mixed company.
zedhed is offline   Reply With Quote
Old 6th December 2016, 13:16   #2
planenut
Regional Secretary
 
planenut's Avatar
 
Rover 1.8T Tourer

Join Date: May 2007
Location: Heathrow
Posts: 6,968
Thanks: 1,551
Thanked 2,036 Times in 1,264 Posts
Default

Whatever the price you're gonna be mortarfied!
planenut is offline   Reply With Quote
Old 6th December 2016, 14:24   #3
zedhed
Posted a thing or two
 
zt saloon turbo

Join Date: Sep 2015
Location: Tipton
Posts: 1,461
Thanks: 1
Thanked 167 Times in 132 Posts
Default

Quote:
Originally Posted by planenut View Post
Whatever the price you're gonna be mortarfied!
zedhed is offline   Reply With Quote
Old 6th December 2016, 14:26   #4
klarzy
This is my second home
 
none but not gone

Join Date: Mar 2013
Location: March, Cambs
Posts: 16,437
Thanks: 894
Thanked 4,247 Times in 3,025 Posts
Default

26 cubic meters or 26 square meters at how deep?
__________________
[SIGPIC][/SIGPIC]….All praise Bananaswan….
klarzy is offline   Reply With Quote
Old 6th December 2016, 15:38   #5
M74
Loves to post
 
M74's Avatar
 
2 x 75 Saloons + MG ZTT

Join Date: May 2008
Location: Cumnock
Posts: 254
Thanks: 29
Thanked 28 Times in 26 Posts
Default

This should help http://www.calculator.net/concrete-calculator.html
__________________

If it ain't broke take it apart to find out why it still works.

M74 is offline   Reply With Quote
Old 6th December 2016, 16:01   #6
p2roverman
Gets stuck in
 
Rover 75 Connie Tourer & Connie SE Saloon & Club SE Tourer

Join Date: Sep 2014
Location: Leeds
Posts: 976
Thanks: 199
Thanked 71 Times in 59 Posts
Default

Quote:
Originally Posted by zedhed View Post
...how much to poor a batch of concrete 26 square metres from a ready mixed company.
It's priced by volume. Just had 5 cubic metres delivered by the type of truck that mixes aggregate, and and cement on site (that way they only mix what is needed and there is no waste); the cost was £672 excluding the cost of the builder/you/labourer barrowing, laying, tamping and levelling. That was a Leeds price, I'm sure thaere will be variations both ways.

I might add I had a builder and mate excavate mechanically some old thick concrete, break it up and move it and import and lay some highway scrapings to ensure a uniform concrete thickness of about 4". but even all this labour etc cost less than the actual concrete.

Depending on access, some mixers will discharge into a small motorised dumper able to access spots where a standard dumper is too big and/or the volume of concrete is such that hand barrowing is not viable.

If you have a local friendly builder you can ask advice, otherwise do some ringing around. Let us know how you get on.

Or mix it yourself with a small electric mixer, ideally with a mate who can monitor the next mix while you lay the first, it halves the time. But in my experience of building my garage I reckoned that in one day it was only practical to lay about about 6 sqaure metres a day of flor thickness.
p2roverman is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 03:44.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright © 2006-2023, The Rover 75 & MG ZT Owners Club Ltd