|
||
|
5th April 2013, 23:43 | #1 |
This is my second home
2000 Wedgey Blue 2.5V6 Beauty Join Date: Jul 2007
Location: Bilston
Posts: 4,486
Thanks: 36
Thanked 29 Times in 16 Posts
|
"A Car you won't get sick of"
I imagine most Members will have seen this Clip.
I would love to show Mr Clarkson this video and shout "Hypocrit" as he watches........
__________________
2.5V6 Auto: Work carried out so far: Crankcase Breather Pipe replaced, O/S CV Joint replaced, Starter Motor Repair Kit Fitted, Front Suspension Overhauled. |
5th April 2013, 23:45 | #2 |
This is my second home
2000 Wedgey Blue 2.5V6 Beauty Join Date: Jul 2007
Location: Bilston
Posts: 4,486
Thanks: 36
Thanked 29 Times in 16 Posts
|
oooo Just found this too, very cool:
__________________
2.5V6 Auto: Work carried out so far: Crankcase Breather Pipe replaced, O/S CV Joint replaced, Starter Motor Repair Kit Fitted, Front Suspension Overhauled. |
6th April 2013, 00:00 | #3 |
Posted a thing or two
Rover 75 CDT Contemporary SE,Tourer - Auto Join Date: Jan 2013
Location: Coventry
Posts: 1,007
Thanks: 280
Thanked 106 Times in 95 Posts
|
I hadn't seen either of them... have now though
__________________
John. Membership Number: 001 607 Past Rover cars: P6 3500S, SD1 3.5, 2 x SD1 2.6, 2 x 820 Si. Current: Rover 75 Contemporary SE CDTi Tourer, Auto. https://s20.postimg.cc/g20qde31p/Rover75.jpg |
6th April 2013, 07:55 | #4 |
This is my second home
ZTT, Contemp Saloon, Duotone Tourer Join Date: May 2012
Location: Llandeilo
Posts: 4,192
Thanks: 290
Thanked 387 Times in 333 Posts
|
Interesting; its odd that I have never seen the inside of the R75 paint line on the vids; its always 600s ! Here too; I guess the money they spent on the Cowley paint area they did not want a camera man in after the 75 started production. |
6th April 2013, 23:31 | #5 |
This is my second home
Rover 75 2.5 V6 Connoisseur SE 4dr manual Wedgewood Blue 2 04-05/06/2001 Join Date: Nov 2006
Location: N.E. Hampshire
Posts: 4,623
Thanks: 289
Thanked 308 Times in 243 Posts
|
Interesting, I hadn't noticed that a fair chunk of this video is 600 - the panel gap check was 600 too. there was also a prototype expansion tank, showing that this was filmed before full production started.
|
|
|