View Single Post
Old 17th February 2010, 18:45   #29
FrenchMike
This is my second home
 
FrenchMike's Avatar
 
Rover 75 Saloon

Join Date: Aug 2007
Location: Avignon
Posts: 4,466
Thanks: 94
Thanked 661 Times in 554 Posts
Default Procedure Before Sending Your Pcb

PROCEDURE BEFORE SENDING YOUR PCB.

At first, manage to permanently connect a wire between pin 3 of the 6 pin plug
And earth in order to forget the +5 degrees limit.

You must hear the turbine increasing its speed and the circulating pump running

If the noise stops after 2minutes and 7 seconds, then,

The pump fuel is faulty or PCB (more likely)

If it stops after 4 minutes then the glow plug resistor is too high.
(More than 0.4 ohm)
And ignition aborts.

However, it is useful to test each component before deciding that PCB is faulty.




Since the work is easier to do than it was first time (no more IC to replace),

My PRICE is 43 £ (one hour work) postage included

Input check ,repair, and outpout control with report.

Mike

Last edited by FrenchMike; 2nd December 2013 at 12:40..
FrenchMike is offline   Reply With Quote