View Single Post
Old 23rd January 2017, 18:02   #9
Pistonbroke666
Posted a thing or two
 
MG ZT 1.8T, MG GS Exclusive

Join Date: Apr 2013
Location: Grays Essex
Posts: 1,809
Thanks: 100
Thanked 282 Times in 205 Posts
Default

Quote:
Originally Posted by COLVERT View Post
The terms you are using are confusing. ALL joists go horizontal.

Vertical means from floor to ceiling.

There will not be a case of ONE joist resting on a wall. It will be all or nothing.
When I say vertical/horizontal I meant in relation to the diagram from a birds eye perspective. As in, going from the longest sides of the diagram to the other long side is horizontal.

Quote:
Originally Posted by COLVERT View Post
Mr PB666 Sir.

Precis of my career.
In charge of construction of---------

1/ More than 250 houses.

2/ Shopping centers.

3/ County mansion for the Duke of Somerset.

4/ Blocks of flats just about everywhere.

5/ 3 years in Dartmoor prison on the internal engineering construction of several cell blocks.

6/ Roads and supporting structures as per the Tamar bridge.

7/ Four large retail outlets in the middle of Plymouth.



And Lots and Lots more.-----------------
Quite a resume there fella.
So from a quick squint you're thinking it's gonna need an RSJ?
__________________
Stage two 1.8T build
Pistonbroke666 is offline   Reply With Quote