Quote:
Originally Posted by grout20
Thanks Brian.
Have never done the "gravity feed" method. Presumably just keep an eye and top up the master cylinder as the fluid disappears ... I guess it's a slow process?
Will it also drain from, and replace, the ABS content... ie the T4 bit?
Cheers
John
|
Takes about five to ten minutes per leg of the circuit John, so just under an hour, and yes the most you need to keep an eye on really is the master cylinder level
It replaces all bar about 40ml in the ABS modulator, so near enough really
Brian